Renovations & Upgrades
Renovation work is a different problem from new construction: the house is occupied, the walls are not square, and nothing behind them is where you expect. We plan around that. You get a clear scope up front, protection for the parts of your home we are not working on, and honest updates when something opens up that changes the job.
At a glance
- Scope items
- 5
- Stages
- 4
- Region
- Ontario
- Quoting
- After a site visit
What this covers
Each line is work we do ourselves, on your job, with our crew.
- 01
Layout changes
Removing, moving or adding walls, opening up rooms, and framing new openings where the structure allows.
- 02
Basement build-out
Framing, subfloor, partitions and finish work to turn unfinished basement space into rooms.
- 03
Additions and bump-outs
Framing and finish carpentry for additions, tying new structure into the existing house.
- 04
Room renovations
Rebuilding a room back to a finished state after layout or structural changes.
- 05
Repairs and corrections
Fixing framing, floors, stairs and trim that were done poorly or have moved over time.
How this one runs
The sequence matters here — doing these out of order is how a job ends up being done twice.
- 01
Walkthrough
We look at the actual space with you, talk through what you want changed, and say plainly what is straightforward and what is not.
- 02
Scope and quote
You get the work written down before it starts — what is included, what is excluded, and what would count as a change.
- 03
Protect and demo
Protection goes up first. Demolition is done carefully so we find surprises early rather than halfway through.
- 04
Build back
Framing, then finishes, then a walkthrough with you against the original scope before we call it done.
In the price, and outside it
Written here so it is never a surprise on an invoice.
- A written scope so both sides know what is being changed
- Dust protection and floor protection in the areas we work through
- Demolition, framing and rebuild within the agreed scope
- A written update if something behind the wall changes the work
- Debris removed as the job goes, not piled until the end
- Permits, drawings and engineering where the work requires them
- Designated substance and asbestos abatement
- Licensed electrical and plumbing work
- Appliance, cabinet and fixture supply unless it is written into the quote
Send us the drawings, or just the idea.
Whichever stage you are at. If you have plans, attach them. If you do not, describe what you want and we will tell you what it takes to get there.