Carpentry & Finishes

Finish carpentry is where a build gets judged. Gaps, proud joints and wandering reveals are what people notice years later. We take the time at this stage that the stage deserves: scribed to the wall you actually have, fastened where it should be, and caulked and filled properly before paint.

At a glance

Scope items
7
Stages
4
Region
Ontario
Quoting
After a site visit
Where a staircase is won or lost
CUT STRINGER — RISE & RUNRISERUNTOTAL RISETOTAL RUNNOSINGEVERY RISE EQUAL — A 3MM DIFFERENCE IS THE ONE PEOPLE TRIP ON
Included scope

What this covers

Each line is work we do ourselves, on your job, with our crew.

  • 01

    Interior doors

    Hanging pre-hung and slab doors, shimmed and set so they swing true and latch without being forced.

  • 02

    Casing and baseboards

    Door and window casing, baseboard, shoe and returns, mitred and coped to close tight.

  • 03

    Trim and millwork

    Crown, chair rail, panelling, window sills and built-out details to match the room.

  • 04

    Flooring

    Hardwood, engineered and laminate installation, including transitions, thresholds and stair nosing.

  • 05

    Stairs

    Treads, risers, stringers, skirt boards, newels and railings finished to a consistent line.

  • 06

    Decks

    Deck framing, decking, stairs, railings and fascia built for Ontario weather.

  • 07

    Painting

    Prep, fill, prime and finish coats on the trim and surfaces within the scope of the job.

Order of work

How this one runs

The sequence matters here — doing these out of order is how a job ends up being done twice.

  1. 01

    Measure and order

    Everything is measured on site, not off the plan, and material is ordered with the profile and species confirmed with you.

  2. 02

    Acclimatise

    Flooring and trim sit in the house before it is installed so it moves before it is fastened, not after.

  3. 03

    Install

    Doors first, then casing, then base, then floor transitions — in the order that keeps every joint accessible.

  4. 04

    Fill, caulk, finish

    Holes filled, joints caulked, surfaces sanded and painted, then checked in daylight from standing height.

The boundary

In the price, and outside it

Written here so it is never a surprise on an invoice.

Included
  • Material laid out and cut so the grain and joints run consistently
  • Fasteners set and filled, joints caulked before paint
  • Reveals kept consistent across the whole room, not just per door
  • Offcuts and dust cleaned up daily
  • A close look with you at the finished work in daylight
Not included
  • Cabinet manufacturing and countertop fabrication
  • Stone, tile and masonry work
  • Floor refinishing on existing hardwood
  • Structural work — that is quoted under framing
Carpentry & Finishes — next step

Send us the drawings, or just the idea.

Whichever stage you are at. If you have plans, attach them. If you do not, describe what you want and we will tell you what it takes to get there.

Start your project